PROTEKEngineering Solutions

Home / Solutions / Product Development / Tolerance Management

Tolerance Management

Datum schemes, stacks, and GD&T prepared so parts assemble as designed.

On this page

Parts that assemble as designed

Tolerance work sets datums, stacks, and GD&T so parts meet at the vehicle, not only on the drawing.

  • Datum schemes that match how the part is located in assembly.
  • Stack studies for gaps, flush, and functional fits.
  • GD&T on drawings that inspection and suppliers can use.
  • Updates when a design or process change moves the stack.